May 21-23, 2019 | Anaheim Convention Center | Anaheim, CA

Execution of 3D Mapping, Planning, Design & Construction of Transportation Infrastructure Mode

Tuesday, June 5, 2018
3:50 pm - 4:10 pm
303A

Execution of 3D Mapping, Planning, Design & Construction of Transportation Infrastructure Mode

In an integrated project, the project flow from conceptualization through implementation and closeout differs significantly from a non-integrated project. In order to establish a proof of concept, California DOT is developing best practices for 3D modeling of existing and proposed surface processing and visualization in order to optimize 3D design grade mapping processing procedures to utilize mashing of conventional, stationary and mobile lidar point cloud, UAS pixel point cloud for existing condition and utilization of CAD to BIM technology for the design condition. As part of this effort, the necessary Information Technology requirements such as large data solution and storage and 24/7 Hardware High Availability (HA) and Access Control List (ACL).

Track Name: SPAR 3D – Transportation
Session Date: Jun 5 2018 3:50 pm – 4:10 pm
© Diversified Communications. All rights reserved.