May 21-23, 2019 | Anaheim Convention Center | Anaheim, CA

Integrated Project Delivery/In-Depth Project Session: UAS implementation and Application for Caltrans Emergency Slide Project

Wednesday, May 22, 2019
1:30 pm - 3:00 pm
251C
Tarek Tabshouri

California Department Of Transportation (Caltrans)

Samer Momani

California Department Of Transportation (Caltrans)

John Erickson

California Department Of Transportation (Caltrans)

Integrated Project Delivery/In-Depth Project Session: UAS implementation and Application for Caltrans Emergency Slide Project

In an integrated project delivery(IPD), the project flow from conceptualization through implementation and closeout need to take advantage of 21st century technology to streamline the process. To establish a proof of concept, California DOT is developing best practices for 3D modeling of existing and proposed surface processing and visualization in order to optimize 3D design grade mapping processing procedures to utilize mashing of conventional, stationary terrestrial lidar point cloud, UAS pixel point cloud for existing condition and utilization of CAD to BIM technology for the design condition for emergency slide project for Santa Clara Rout-35 Post mile 10.5 in Santa Clara County, California.

Track Name: SPAR 3D
Session Date: May 22 2019 1:30 pm - 3:00 pm
© Diversified Communications. All rights reserved.